A PTO rejection is a retake appointment. Shoot it right the first time.

Every attachment, termination, and placard — stamped, sharp, and organized into the package the utility and the local inspector want to see.

PTO-package organization Roof penetrations on record Milestone proof for financing

An install, documented survey to PTO

Mechanical, electrical, commissioning — proof at every stage.

Site survey

  • Roof condition and existing penetrations before you touch it
  • Rafter spacing and attic structure
  • Main panel: capacity, breaker space, service entrance
  • Shading reference shots

Mechanical & electrical

  • Every mount: sealed flashing, torqued hardware
  • Terminations and wire management under the array
  • Combiner, disconnects, inverter, rapid shutdown
  • Conduit runs and penetration sealing

Commissioning & PTO

  • Voltage and current readings in frame
  • Placards and labels, legible, where code wants them
  • Meter and interconnection point
  • The PTO set: organized, sharp, submitted once

The package that clears PTO the first time

A blurry placard photo can cost two weeks: the utility kicks the package back, someone drives out to reshoot, and the system sits dark while the financing clock runs. The fix is a photo checklist per install — attachments, terminations, labels, readings — shot sharp and organized by milestone, so the package is built before the crew leaves the site. The same set answers the roof-leak call in year three: checklist-driven photos of every sealed penetration, and one link for the homeowner who wants to see what's on their roof.

Built for solar installers

Milestone sets, financing-ready

Racking, panels, electrical, commissioning — dated proof per stage, before the invoice goes out.

Penetrations on record

Every mount photographed flashed and sealed. The leak claim in year three meets the photo from day one.

The PTO shot list

Placards, disconnects, readings, labels — a repeatable checklist so the package passes review the first time.

Terminations you can defend

Connector crimps, combiner wiring, rapid shutdown — close-ups that show the workmanship, stamped.

Subs and office, same record

Install subs push photos through upload-only links; the office assembles the package without chasing texts.

Frequently Asked Questions

Mostly verification failures: blurry placards, missing disconnect photos, labels that can't be read. A shot list per install kills the retake trip.

Every attachment, flashed and sealed, photographed before the panel covers it. Dated penetration records end most leak arguments before they start.

Yes — share a dated milestone set per stage. Funding moves when proof is organized.

No. Upload-only links drop their photos straight into the job, dated and organized.

Nothing. LibreCam is free for every installer on every crew.

Build the PTO package on the roof, not at the office.

Survey to interconnection — stamped, sharp, organized.

Get Early Access

Get the app before everyone else. Free forever — no seat tax, no expiration.

Phone (optional)
Get Early Access